Our Heritage & Milestones

Defining Southeast Asia’s mobility standards for over 30 years. From Malaysia’s first locally assembled rail coaches to modern experiential ropeway developments, we provide solutions to complete the value chain. 

hartasuma tourism featured
2022 – Present

Experiential Ropeway Development Concession

Secured the RM450 million Design, Finance, Build, Operate, and Transfer (DFBOT) concession for the Penang Hill Cable Car development, marking a strategic diversification into sustainable, high-capacity experiential ropeway development.
2022 – Present
hartasuma key milestone 9
2012 – 2017

Scaling Rolling Stock Assembly (KLAV 27)

Supplied 108 Light Rail Transit (LRT) cars for the Kelana Jaya Line. This flagship project significantly expanded our local manufacturing footprint by integrating advanced bogie assembly and complex systems integration. 

2012 – 2017
hartasuma milestones 2012-20177
2012 – 2017

Kuala Lumpur Additional Vehicle (KLAV 14)

Delivered 56 LRT cars (14 four-car trainsets) and executed comprehensive wayside system upgrades for the Kelana Jaya Line, cementing our capacity as Malaysia’s definitive rolling stock assembler.

2012 – 2017
hartasuma milestones 2012
2012

Pioneering Mid-Life Refurbishment (MLR)

Executed Malaysia’s definitive large-scale transit overhaul by successfully refurbishing, rectifying, and coupling 68 existing LRT cars for the Kelana Jaya Line. HARTASUMA remains a pioneer in optimising asset lifecycles for sovereign transit operators.

 
2012
hartasuma key milestone 6
2010 – 2012

New Generation of Passenger Coaches

Designed, manufactured, and supplied 12 bespoke passenger coaches, customised with two buffet coaches and two power-generated cars for Keretapi Tanah Melayu Berhad (KTMB).

2010 – 2012
hartasuma milestones re1
2009

KTMB Royal saloon coach

Design, Manufacture & Supply of the Royal Saloon Coach (SK1).

2009
hartasuma journey200809
2008 – 2009

Kuala Lumpur International Airport (KLIA) Aerotrain System Expansion

Alstom-HARTASUMA Consortium executed the expansion of the Automated People Mover (APM) Aerotrain system at Kuala Lumpur International Airport (KLIA), optimising high-volume airport transit mobility.

2008 – 2009
Subang Skypark
2007 – 2018

Subang SkyPark Regeneration

Regenerated Terminal 3 into a premier FBO, private commercial space, and regional aviation centre. Developing the 8.15km SkyPark Link established critical national rail connectivity, culminating in a successful 2018 commercial divestment.

2007 – 2018
hartasuma key milestone 3
2006 – 2008

Kuala Lumpur ‘818’ LRT Cars

With Alstom-HARTASUMA Consortium, we supplied 140 LRT cars alongside extensive upgrades to wayside, electrical, and mechanical systems for the Kelana Jaya Line to meet escalating urban commuter demand.

2006 – 2008
hartasuma milestones re2
2003 – 2006

Malaysia’s First Locally Assembled Coaches

HARTASUMA designed, manufactured, and supplied the first locally assembled passenger coaches (11 units) in Malaysia for KTMB, pioneering localisation within the national rail industry.

2003 – 2006
hartasuma key milestone 1
1994 – 2003

KTMB Passenger Coach Fleet

Overhauled & refurbished passenger coaches and supplied sub-system components for KTMB.

1994 – 2003

Let's Join us Today